Back to Solutions ENGINEERING & FIELD SERVICES

Engineering Services.Built for the Field.

Connect requests, technical drawings, revisions, work orders, technicians, assets, spare parts, inspections, sign-offs, and billing in one controlled engineering operation.

WORK ORDERSREVISION CONTROLFIELD APPASSET HISTORY
Engineering Control Room
Live operation
ACTIVE WORK ORDERS287 today
SLA ACHIEVED94%+3.2% MTD
CRITICAL ASSETS3Action required
TODAY’S DISPATCHField priorities
Open board →
01
Compressor Line 2WO-240918 · Breakdown
DDimas
On site
02
HVAC AHU-07WO-240921 · Preventive
AAlya
Travelling
03
Panel MCC-04WO-240927 · Inspection
RRizky
Ready
Last sync 12:48:16TEKADA · ENGINEERING OPS
ENGINEERING WORKFLOW

From request to verified completion.

Every job keeps its scope, owner, revision, materials, schedule, field evidence, approvals, and history connected from start to close.

01

Request

Need, location, priority, symptom, and SLA.

02

Assess

Survey, risk, drawings, scope, and estimate.

03

Approve

Revision, materials, cost, permits, and authorisation.

04

Plan

Technicians, skills, tools, spare parts, and schedule.

05

Execute

Checklists, readings, photos, time, and actual materials.

06

Verify

Inspection, test results, customer sign-off, and as-built.

07

Close

Asset history, warranty, cost, invoice, and lessons learned.

CHANGE & DOCUMENT CONTROL

Keep every team on the correct revision.

Control drawings, specifications, BOMs, method statements, ECRs, ECNs, approvals, and as-built records without losing the change trail.

  • 01
    Single source of truthCurrent documents, revisions, owners, and effective dates stay explicit.
  • 02
    Traceable approvalsEvery change retains its reason, impact, approver, and decision time.
  • 03
    Release to the fieldTeams receive the new revision and acknowledge it before execution.
Custom Engineering Workflow
DOCUMENT REGISTEREngineering release control
All 48Review 6Approved 31Draft 11
ID / TITLEREVSTATUSUPDATED
DWGDRW-ME-041Mounting Bracket
Rev C Approved
SPCSPEC-EL-118MCC Wiring
Rev B Review
BOMBOM-PU-022Pump Assembly
Rev D Released
MSMS-AC-009AHU Commissioning
Rev A Draft
Audit trail active48 controlled documents
FIELD EXECUTION

Dispatch technicians with complete context.

Priority, location, skills, tools, spare parts, checklists, and asset history are available before work begins.

FIELD SERVICE BOARDThursday, 31 July
4 technicians available
Ready2
WO-240918 · 08:45

Compressor Line 2

Breakdown · Batam Plant

DDimasP1
WO-240931 · 15:20

Pump P-201

Calibration · Batam Plant

NNadiaP2
Travelling1
WO-240921 · 10:30

HVAC AHU-07

Preventive · Batam Plant

AAlyaP2
On Site1
WO-240927 · 13:00

Panel MCC-04

Inspection · Batam Plant

RRizkyP2
09:41
WO-240918Compressor Line 2
P1
On site04:12:38
TASK CHECKLIST
VIBRATION READING
4.2mm/sWithin limit

Checklists, readings, photos, materials, time, and signatures remain attached to the same work order.

ASSET RELIABILITY

Turn maintenance into measurable decisions.

Unify preventive schedules, breakdowns, inspections, calibration, downtime, spare parts, and service history to keep assets reliable.

ASSET HEALTHCritical equipment overview
Last 30 days
87/100HEALTH SCORE
Planned maintenance92%46 / 50
Mean response38m-12m MTD
Repeat failure2.4%-0.8%
ASSETCONDITIONNEXT ACTION
Air Compressor AC-02WatchVibration inspection · 2 days
Chiller CH-01HealthyPM service · 14 days
Pump P-201DueCalibration · today
JOB COST & BILLINGWO-240918 · Compressor Line 2
LABOUR6.5hIDR 2.9m
PARTS4IDR 6.4m
EXPENSES2IDR 0.8m
LMechanical technician5.0h × IDR 420k
IDR 2.10m
PCoupling insert2 pcs · SN tracked
IDR 4.80m
TVibration analysis1 service
IDR 1.25m
TOTAL COSTIDR 10.1mBILLABLEIDR 14.6m
Margin 30.8%
SERVICE COMMERCIALS

Move from completed work to invoice without re-entry.

Connect quotations, labour, materials, expenses, customer sign-off, warranty, and billing so job-level margin stays visible.

Actual job costLabour, parts, tools, subcontracting, and expenses on one work order.
Customer sign-offAcceptance, completion evidence, and approval support invoicing.
Warranty visibilityFlag warranty work, repeat visits, and non-billable costs.
Accounting System
CONNECTED CAPABILITIES

One backbone for engineering and field service.

Build the modules needed now, then connect the next process without replacing the entire system.

01

Work Order Control

Requests, assignment, SLA, status, labour, evidence, and closure.

02

Engineering Change

ECRs, ECNs, drawing revisions, BOMs, approvals, and effective dates.

03

Field Service

Dispatch, mobile checklists, location, photos, signatures, and offline capture.

04

Asset & Maintenance

Asset registers, preventive schedules, breakdowns, meters, and history.

05

Parts & Tools

Reservations, van stock, issue-return, serials, calibration, and replenishment.

06

Commercial Control

Quotations, rates, expenses, warranties, service contracts, and invoices.

CONNECTS WITH
PMSWMSINVENTORYACCOUNTINGERPAPIMOBILEIoT
BUILT FOR TECHNICAL OPERATIONS

Flexible across technical service models.

04

Engineering Contractors

Project work packages, drawings, materials, site progress, and handover.

Discuss the use case →
IMPLEMENTATION PATH

Start with the most critical work control.

A phased implementation keeps scope realistic and ensures the system reflects real field conditions.

01

Map

Map requests, approvals, documents, work orders, technicians, and asset data.

02

Control

Define statuses, ownership, SLAs, revision rules, and mandatory evidence.

03

Connect

Connect maintenance, inventory, mobile field apps, accounting, and ERP.

04

Improve

Use downtime, response, repeat failure, cost, and margin data to improve.

FAQ

Questions before building an engineering services system.

Clear answers about field service, maintenance, engineering change, mobile technicians, and system integration.

01How is a field service system different from a preventive maintenance system?

A Preventive Maintenance System focuses on asset reliability and maintenance schedules. Field service adds customer requests, technician dispatch, mobile execution, SLAs, sign-off, service contracts, and billing. Both can operate in one connected flow.

02Can technicians work from a mobile device?

Yes. Technicians can receive work orders, view drawings and asset history, complete checklists, capture readings, consume spare parts, take photos, collect signatures, and close work from a mobile application.

03Can the system control drawings and engineering changes?

Yes. The system can manage document numbers, revisions, ECRs, ECNs, approvals, effective dates, distribution, acknowledgement, and as-built records so teams use the current document.

04Can it connect with inventory and accounting?

Yes. Spare parts, tools, van stock, purchase requests, job costs, invoices, and journals can be integrated through APIs, databases, file exchange, or middleware depending on the available systems.

TEKADA · ENGINEERING OPERATIONS

Make every technical job visible and accountable.

Map requests, engineering changes, work orders, field execution, asset history, and billing to identify the first digitalisation priority.

Consult on Engineering Servicesinfo@tekada.id
TALK TO AN EXPERT

Ready to solve your Digital Transformation challenges?

Discuss operational priorities, current systems, integrations, and desired outcomes with a TEKADA consultant.